What is a SMED Template?

A Single-Minute Exchange of Die (SMED) template is a structured document or digital tool used to standardize the process of equipment setup and changeover in manufacturing. Developed by Japanese engineer Shigeo Shingo, The goal of this template is to help reduce setup times to less than ten minutes, hence the term “single-minute.” While manufacturing processes benefit greatly from SMED, other industries that have frequent changeovers are able to take advantage of the features of this approach.

Importance

A SMED template is crucial in Lean manufacturing because it standardizes and optimizes the equipment setup and changeover process, directly impacting productivity and efficiency. By providing a clear, step-by-step guide, the template helps operators perform setups more consistently, reducing variation and human error.

With a well-maintained SMED template, companies can achieve significantly shorter changeover times, allowing them to respond more flexibly to production demands, reduce inventory levels, and improve overall production flow. Additionally, the template supports continuous improvement by highlighting opportunities to refine tasks and eliminate unnecessary steps so that greater focus can be redirected to checking for quality and compliance.

Benefits

Using a SMED (Single-Minute Exchange of Die) template offers multiple benefits that enhance efficiency and flexibility in manufacturing operations. Here are some key advantages:

  • Reduced Setup Time: By clearly outlining each step in the changeover process and identifying tasks that can be done while the machine is still running, a SMED template minimizes downtime, enabling faster transitions between production runs.

  • Increased Production Capacity: Shorter setup times mean that machines spend less time idle and more time producing, allowing for higher output without the need for additional equipment or shifts.

  • Lower Costs: Faster setups using a template reduce labor and machine costs associated with changeovers, while increased production capacity may decrease the need for additional capital investment.

  • Employee Engagement: By involving operators in the SMED process and using a standardized template, employees can contribute to process improvements and develop a deeper understanding of setup efficiencies.

What to Include in a SMED Template

Utilizing SMED templates helps reduce downtime and improve efficiency by breaking down changeover activities into manageable steps. Here’s what to include in a SMED template:

  • Specific equipment

  • The time the equipment is running

  • The time the equipment is stopped

  • Equipment changeover time before SMED

  • Production line/process

  • Number of operators

  • Date of the changeover

  • Location

  • Equipment changeover time after SMED

  • Photo of the equipment

How to Use a SMED Template

It is important to properly know how to use a SMED template to maximize the benefits it presents. Here is a step-by-step guide to help you get started:

  1. Describe the circumstances surrounding the changeover. Mention the equipment used, the time equipment was running and stopped, and the production line involved.

  2. Go into further detail with the changeover elements present. Determine whether this changeover can be completed while the equipment is running.

  3. Indicate if there is an internal changeover element present and answer the relevant questions listed in the template.

  4. Be as specific as possible when describing suggestions on how to perform changeovers in less time to help with continuous improvement.

  5. Add the time required for internal changeover elements.

  6. Record the equipment changeover time after going through the SMED process.

  7. Update the template as often as necessary. Append additional sections to record any new observations and recommendations, if needed.

SMED Template PDF Report

To give you a better understanding of the template, here is a sample of a filled-out SMED report:

 width=
This is a CTA image

Still looking for a checklist?

Create a custom checklist template instantly with AI

FAQs about SMED Template

GC

Article by

Gabrielle Cayabyab

SafetyCulture Content Specialist

View author profile

Related resources you might like

Powered by

Front of House (FOH) Changeover Checklist

This checklist was designed to streamline changeover processes between worker shifts. Use it to keep track of inventory, check for equipment, and ensure all tasks are completed before the next shift. 

Powered by

Comprehensive End of Shift Report

Report existing issues during the shift and assign action items to appropriate personnel. Finish the form by noting changes, observations, and recommendations for continuous process improvement.

Powered by

Kaizen Report Template

Use this kaizen report template to help make the PDSA cycle more efficient by pairing it with rapid improvement methods like Kaizen events. This template lets you define the project, category, and section/process, as well as pinpoint the root cause of the problem.

Articles

Yard Management Software

Discover the leading yard management software and optimize the daily operations in shipping yards with your top pick.

Waterfall Methodology: The Pros and Cons

Discover how waterfall methodology employs a sequential process to manage projects and their functionality and application.

Return to Work Form

Return to work forms to simplify documentation for employees who are ready to go back to work. Get started for free today with SafetyCulture.